Glazier: Glass Solutions Inc.
Glazier Glass Solutions of Chicago asked Glass + Metal Craft to provide the glass and setting channel for the installation of 34 new vestibules throughout the first four floors of the Willis Tower – the nation’s third tallest building. And, equally important, to lead the engineering and provide project management of this substantial effort.
Our Fulcrum Architectural Design Assist Division drew on our OSTIUM Pre-Engineered Glass Vestibules and Entrance Systems technology to quickly and cost-effectively engineer and provide stamped drawings for all the steel frames for the entrances, all attachments of the glass to the frames, and all attachments to the concrete – variations of 15 different vestibule designs.
G+MC’s Project Management Team coordinated the deliverables of the steel, door, and cladding suppliers with the delivery of the glass for ease of installation and workflow.
The project began in mid 2018, and completed successfully within two years. A home run for all involved!